Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Natural, Societal & Political Domain Variables :
Water Quality or
Water Quantity
& Climate :
Dry-summer or
Humid mid-latitude (Köppen C-type)
& Water Use :
Hydropower Generation or
Industry - consumptive use or
Other
& Stakeholder Type:
Sovereign state/national/federal government
& Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
Other
Click on one or more items below to narrow your results.
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
B
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- Case Study of Transboundary Dispute Resolution: the Tigris-Euphrates Basin
- China: The Three Gorges Dam Hydroelectric Project
- Competing Demands Among Water Uses in the Apalachicola- Chattahoochee-Flint River Basin
- Conflict Management Strategies Among Riparians Within the Indus River Basin
E
- Efforts of Coordinating Joint Development of Hydropower Projects Within the Salween Basin
- Efforts to Resolve the Aral Sea Crisis
G
I
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
M
P
R
T
U
- Upstream Hydropower Development in the Syr Darya River Basin, Downstream Impacts, and Potential Opportunities
- Urmia Lake: The Need for Water Diplomacy
W