The Lesotho Highlands Water Project

From AquaPedia Case Study Database
Jump to: navigation, search
{{#var: location map}}


Case Description
Loading map...
, , ,
Geolocation: -29° 30' 53.2238", 28° 34' 47.2732"
Total Watershed Population: 13,002,500 million
Total Watershed Area: 944,051 km2364,498.091 mi²
Climate Descriptors: Dry-summer, temperate
Predominant Land Use Descriptors: rangeland, urban
Important Uses of Water: Agriculture or Irrigation, Domestic/Urban Supply, Hydropower Generation
Agreements: Treaty on the Lesotho Highlands Water Project between the government of the Republic of South Africa and the government of the Kingdom of Lesotho

More facts

Summary

Development in Lesotho has been limited by its lack of natural resources and investment capital. Water is its only abundant resource, which is precisely what regions of neighboring South Africa have been lacking. A project to transfer water from the Senqu River to South Africa had been investigated in the 1950s, and again in the 1960s. The project was never implemented due to disagreement over appropriate payment for the water. In 1978, the governments of Lesotho and South Africa appointed a joint technical team to investigate the possibility of a water transfer project. A treaty between the two states was necessary to negotiate for this international project. Negotiations proceeded through 1986 and the "Treaty on the Lesotho Highlands Water Project between the Government of the Kingdom of Lesotho and the Government of the Republic of South Africa " was signed into law on October 24, 1986. The Treaty spells out an elaborate arrangement of technical, economic, and political intricacy. The water transfer component was entirely financed by South Africa, which would also make payments for the water that would be delivered. The hydropower and development components were undertaken by Lesotho, which received international aid from a variety of donor agencies, particularly the World Bank. Phase IA of the Lesotho Highlands Water Project was completed in 1998, at a cost of $2.4 billion. Phase IB of the project was completed in early 2004, as a cost of approximately $1.5 billion. The Lesotho Highlands Water Project provides lessons in the importance of an integrated approach to negotiating the allocation of a "basket" of resources. South Africa receives cost-effective water for its continued growth, while Lesotho receives revenue and hydropower for its own development.

Natural, Historic, Economic, Regional, and Political Framework

Lesotho Highlands.jpg Image 1. Map of the Senqu River (Lesotho Highlands Project)[1]

Background

Development in Lesotho has been limited by its lack of natural resources and investment capital. Water is its only abundant resource, which is precisely what regions of neighboring South Africa have been lacking. A project to transfer water from the Senqu River to South Africa had been investigated in the 1950s, and again in the 1960s. The project was never implemented due to disagreement over appropriate payment for the water.


The Problem

Lesotho, completely surrounded by South Africa, is a state poor in most natural resources, water being the exception. The industrial hub of South Africa, from Pretoria to Witwatersrand, has been exploiting most of the local water resources for years and the South African government has been in search of alternate sources. The elaborate technical and financial arrangements that led to construction of the Lesotho Highlands Water Project (LHWP) provide a good example of the possible gains of an integrative arrangement including a diverse "basket" of benefits.


Attempts at Conflict Management

In 1978, the governments of Lesotho and South Africa appointed a joint technical team to investigate the possibility of a water transfer project. The first feasibility study suggested a project to transfer 35 m3/sec, four dams, 100 km of transfer tunnel, and a hydropower component. Agreement was reached to study the project in more detail, the cost of the study to be borne by both governments.

The second feasibility study, completed in 1986, concluded that the project was feasible, and recommended that the amount of water to be transferred be doubled to 70 m3/sec. A treaty between the two states was necessary to negotiate for this international project. Negotiations proceeded through 1986 and the "Treaty on the Lesotho Highlands Water Project between the Government of the Kingdom of Lesotho and the Government of the Republic of South Africa " was signed into law on October 24, 1986.

It is testimony to the resilience of these arrangements that no significant changes were made despite the dramatic political shifts in South Africa at the end of the 1980s until 1990.

Outcome

The Treaty spells out an elaborate arrangement of technical, economic, and political intricacy. A boycott of international aid for apartheid South Africa required that the project be financed, and managed, in sections. The water transfer component was entirely financed by South Africa, which would also make payments for the water that would be delivered. The hydropower and development components were undertaken by Lesotho, which received international aid from a variety of donor agencies, particularly the World Bank. Phase IA of the Lesotho Highlands Water Project was completed in 1998, at a cost of $2.4 billion. Phase IB of the project was completed in early 2004, as a cost of approximately $1.5 billion.

The 1986 treaty provided for the construction of additional Phases: II-IV. However, changes in the projection of water demand in South Africa, along with concerns over negative social and environmental impacts of the project, have lead to negotiations on the future phases. In 2004 a feasibility study of Phase 2 began between the nations of South Africa and Lesotho.

Although Environmental Action Plans (EAPs) were carried out for both Phases IA and IB, EAPs for Phase IA were carried out while construction for the phase was already underway. It was in the course of Phase IB EAPs in 1994 that the need for an instream flow requirement became apparent. After studies of the biophysical, social and economic effects of the project were carried out, an Instream Flow Requirement (IFR) policy was implemented in 2002. In particular, river reaches and communities downstream of the project sites were considered in the assessment, whereas EAPs of Phase I considered only those areas only upstream of the project sites.

Issues and Stakeholders

Negotiating technical and financial details of water transfer from Lesotho to South Africa.

NSPD: Water Quantity, Governance, Assets
Stakeholder Types: Sovereign state/national/federal government, Non-legislative governmental agency, Industry/Corporate Interest

Lesotho, completely surrounded by South Africa, is a state poor in most natural resources, water being the exception. The industrial hub of South Africa, from Pretoria to Witwatersrand, has been exploiting most of the local water resources for years and the South African government has been in search of alternate sources. The elaborate technical and financial arrangements that led to construction of the Lesotho Highlands Water Project (LHWP) provide a good example of the possible gains of an integrative arrangement including a diverse "basket" of benefits.

Stakeholders:

  • Lesotho
  • South Africa
  • World Bank


Analysis, Synthesis, and Insight

What is an ASI?

Individuals may add their own Analysis, Synthesis, and Insight (ASI) to a case. ASI sections are protected, so that each person who creates a section retains authorship and control of their own content. You may add your own ASI contribution from the case study edit tab.

Learn more

Lessons Learned in Lesotho HIghlands Water Project


Contributed by: Aaron T. Wolf, Joshua T. Newton, Matthew Pritchard (last edit: 12 February 2013)




Key Questions

How does asymmetry of power influence water negotiations and how can the negative effects be mitigated?

Even with power disparity, there is possibility for agreement over water resources through economic benefits. South Africa is a much more powerful nation than Lesotho, but Lesotho has abundant water resources, which, through the Highlands Project, will benefit both nations economically and through the provision of water to South Africa. It is possible even when there is such a wide gap between nations in terms of power, to collaborate for the mutual gain of both countries.



Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project?

It is more economically sound to begin impact studies before nations start to construct projects. It was shown through the Lesotho Highlands Water Project that if impact studies are started after the initiation of a major hydro-project, the costs for the project go up as necessary components for the project may not have been considered pre-study. For the Phase II of the LHWP, studies are being conducted to judge the feasibility of a project that was designed more than 15 years to ago to investigate in a more comprehensive manner the possible impacts of the project.



What mechanisms beyond simple allocation can be incorporated into transboundary water agreements to add value and facilitate resolution?

Renegotiation clauses in an agreement can prevent issues from arising for the nations involved. The LHWP treaty also exemplifies the importance of providing for renegotiation of project terms. In the absence of such a provision, the additional phases of the project might have been implemented without adequate consideration of their feasibility.

External Links

  1. ^ Product of the Transboundary Freshwater Dispute Database, Department of Geosciences, Oregon State University. Additional information about the TFDD can be found at:http://www.transboundarywaters.orst.edu/research/case_studies/Lesotho_Highlands_New.htm



Facts about "The Lesotho Highlands Water Project"RDF feed
AgreementTreaty on the Lesotho Highlands Water Project between the government of the Republic of South Africa and the government of the Kingdom of Lesotho +
Area944,051 km² (364,498.091 mi²) +
ClimateDry-summer + and temperate +
Geolocation-29° 30' 53.2238", 28° 34' 47.2732"Latitude: -29.5147844
Longitude: 28.5797981
+
IssueNegotiating technical and financial details of water transfer from Lesotho to South Africa. +
Key QuestionHow does asymmetry of power influence water negotiations and how can the negative effects be mitigated? +, Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project? + and What mechanisms beyond simple allocation can be incorporated into transboundary water agreements to add value and facilitate resolution? +
Land Userangeland + and urban +
NSPDWater Quantity +, Governance + and Assets +
Population13,002,500 million +
Stakeholder TypeSovereign state/national/federal government +, Non-legislative governmental agency + and Industry/Corporate Interest +
Water UseAgriculture or Irrigation +, Domestic/Urban Supply + and Hydropower Generation +
Has subobjectThis property is a special property in this wiki.The Lesotho Highlands Water Project +, The Lesotho Highlands Water Project + and The Lesotho Highlands Water Project +