Difference between revisions of "The Lesotho Highlands Water Project"

From AquaPedia Case Study Database
Jump to: navigation, search
[checked revision][checked revision]
(Created page with "{{Case Study |Geolocation=-29.5147844, 28.579798100000062 |Population=13,002,500 |Area=944,051 |Climate=Dry-summer; temperate |Land Use=rangeland, urban |Water Use=Agriculture...")
 
Line 1: Line 1:
 
{{Case Study
 
{{Case Study
|Geolocation=-29.5147844, 28.579798100000062
+
|Geolocation=-29.5147844, 28.5797981
 
|Population=13,002,500
 
|Population=13,002,500
 
|Area=944,051
 
|Area=944,051
Line 12: Line 12:
 
|ASI=
 
|ASI=
 
|Key Questions=
 
|Key Questions=
 +
|Summary=Development in Lesotho has been limited by its lack of natural resources and investment capital. Water is its only abundant resource, which is precisely what regions of neighboring South Africa have been lacking. A project to transfer water from the Senqu River to South Africa had been investigated in the 1950s, and again in the 1960s. The project was never implemented due to disagreement over appropriate payment for the water. In 1978, the governments of Lesotho and South Africa appointed a joint technical team to investigate the possibility of a water transfer project. A treaty between the two states was necessary to negotiate for this international project. Negotiations proceeded through 1986 and the "Treaty on the Lesotho Highlands Water Project between the Government of the Kingdom of Lesotho and the Government of the Republic of South Africa " was signed into law on October 24, 1986. The Treaty spells out an elaborate arrangement of technical, economic, and political intricacy. . The water transfer component was entirely financed by South Africa, which would also make payments for the water that would be delivered. The hydropower and development components were undertaken by Lesotho, which received international aid from a variety of donor agencies, particularly the World Bank. Phase IA of the Lesotho Highlands Water Project was completed in 1998, at a cost of $2.4 billion. Phase IB of the project was completed in early 2004, as a cost of approximately $1.5 billion. The Lesotho Highlands Water Project provides lessons in the importance of an integrated approach to negotiating the allocation of a "basket" of resources. South Africa receives cost-effective water for its continued growth, while Lesotho receives revenue and hydropower for its own development.
 
|External Links=
 
|External Links=
 
|Case Review={{Case Review Boxes
 
|Case Review={{Case Review Boxes

Revision as of 10:20, 29 August 2012

{{#var: location map}}


Case Description
Loading map...
Geolocation: -29° 30' 53.2238", 28° 34' 47.2732"
Total Population 13,002,50013,002,500,000,000 millionmillion
Total Area 944,051944,051 km²
364,498.091 mi²
km2
Climate Descriptors Dry-summer, temperate
Predominent Land Use Descriptors rangeland, urban
Important Uses of Water Agriculture or Irrigation, Domestic/Urban Supply, Hydropower Generation

Summary

Development in Lesotho has been limited by its lack of natural resources and investment capital. Water is its only abundant resource, which is precisely what regions of neighboring South Africa have been lacking. A project to transfer water from the Senqu River to South Africa had been investigated in the 1950s, and again in the 1960s. The project was never implemented due to disagreement over appropriate payment for the water. In 1978, the governments of Lesotho and South Africa appointed a joint technical team to investigate the possibility of a water transfer project. A treaty between the two states was necessary to negotiate for this international project. Negotiations proceeded through 1986 and the "Treaty on the Lesotho Highlands Water Project between the Government of the Kingdom of Lesotho and the Government of the Republic of South Africa " was signed into law on October 24, 1986. The Treaty spells out an elaborate arrangement of technical, economic, and political intricacy. . The water transfer component was entirely financed by South Africa, which would also make payments for the water that would be delivered. The hydropower and development components were undertaken by Lesotho, which received international aid from a variety of donor agencies, particularly the World Bank. Phase IA of the Lesotho Highlands Water Project was completed in 1998, at a cost of $2.4 billion. Phase IB of the project was completed in early 2004, as a cost of approximately $1.5 billion. The Lesotho Highlands Water Project provides lessons in the importance of an integrated approach to negotiating the allocation of a "basket" of resources. South Africa receives cost-effective water for its continued growth, while Lesotho receives revenue and hydropower for its own development.



Natural, Historic, Economic, Regional, and Political Framework

Analysis, Synthesis, and Insight

What is an ASI?

Individuals may add their own Analysis, Synthesis, and Insight (ASI) to a case. ASI sub-articles are protected, so that each contributor retains authorship and control of their own content. Edit the case to add your own ASI.

Learn more

ASI:Lessons Learned in Lesotho HIghlands Water Project

(read the full article... )

Contributed by: Aaron T. Wolf, Joshua T. Newton, Matthew Pritchard (last edit: 12 February 2013)