Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Stakeholder Type:
Non-legislative governmental agency
& Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
How can packages or options that link issues creatively or build on possible technology innovations be employed to create non-zero sum choices within negotiations that include water resources? or
What kinds of water treaties or agreements between countries can provide sufficient structure and stability to ensure enforceability but also be flexible and adaptable given future uncertainties? or
Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project?
Click on one or more items below to narrow your results.
- Agriculture or Irrigation (10)
- Domestic/Urban Supply (9)
- Fisheries - farmed (1)
- Fisheries - wild (5)
- Hydropower Generation (7)
- Industry - consumptive use (2)
- Industry - non-consumptive use (3)
- Livestock (2)
- Mining/Extraction support (1)
- Other Ecological Services (3)
- Recreation or Tourism (2)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
2
C
F
G
I
- Integrated Joint Management Agreements of Mekong River Basin Riparians
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
M
O
T
- The Lesotho Highlands Water Project
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
U
W