Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Natural, Societal & Political Domain Variables :
Ecosystems or
Other
& Land Use :
conservation lands or
forest land
& Stakeholder Type:
Community or organized citizens
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (4)
- Continental (Köppen D-type) (7)
- Dry-summer (7)
- Dry-winter (2)
- Humid mid-latitude (Köppen C-type) (4)
- Moist (3)
- Moist tropical (Köppen A-type) (4)
- Monsoon (3)
- Semi-arid/steppe (Köppen B-type) (7)
- alpine (2)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (3)
- Agriculture or Irrigation (17)
- Domestic/Urban Supply (12)
- Fisheries - farmed (2)
- Fisheries - wild (8)
- Hydropower Generation (10)
- Industry - consumptive use (4)
- Industry - non-consumptive use (3)
- Livestock (4)
- Mining/Extraction support (2)
- Other Ecological Services (6)
- Recreation or Tourism (4)
- How can consultation and cooperation among stakeholders and development partners be better facilitated/managed/fostered? (3)
- How can costs for water quality projects be distributed between polluters and beneficiaries? (1)
- How can government be dis/incentivized to offer an inclusive planning process? (1)
- How can increasing urban water demand be balanced between the needs of the urban population and industry? (1)
- How do issues of equity and development impact the identification of stakeholders in cases involving hydropower or other revenue generating water infrastructure? (3)
- To what extent can international actors and movements from civil society influence water management? How and when is this beneficial/detrimental and how can these effects be supported/mitigated? (4)
- What calculations and considerations should be investigated by countries looking to harness additional hydropower? Which potential outcomes should be investigated or identified? (2)
- What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions? (3)
- What kinds of water treaties or agreements between countries can provide sufficient structure and stability to ensure enforceability but also be flexible and adaptable given future uncertainties? (4)
- What mechanisms beyond simple allocation can be incorporated into transboundary water agreements to add value and facilitate resolution? (6)
- What role(s) can hydropower play in a nation's energy strategy? (2)
- Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project? (2)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
E
- Efforts of Coordinating Joint Development of Hydropower Projects Within the Salween Basin
- Efforts to Resolve the Aral Sea Crisis
F
- Flood Management in Maritsa River Basin
- Forming Groundwater Sustainability Agencies for Sonoma County
I
I cont.
- Integrated Joint Management Agreements of Mekong River Basin Riparians
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
M
P
R
T
T cont.
U
W