Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Natural, Societal & Political Domain Variables:
Values and Norms
& Land Use :
mining operations or
Other or
Other
& Water Use :
Hydropower Generation or
Other
& Stakeholder Type :
Development/humanitarian interest or
Federated state/territorial/provincial government
& Key Question :
What calculations and considerations should be investigated by countries looking to harness additional hydropower? Which potential outcomes should be investigated or identified? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions? or
Other
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (6)
- Continental (Köppen D-type) (4)
- Dry-summer (6)
- Dry-winter (2)
- Humid mid-latitude (Köppen C-type) (3)
- Moist (1)
- Moist tropical (Köppen A-type) (1)
- Monsoon (2)
- Semi-arid/steppe (Köppen B-type) (5)
- alpine (2)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (3)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
2
A
- Addressing Declining Groundwater Supply in Umatilla County, Oregon, USA
- Addressing the Transboundary Water Conflict Between the Blue Nile Riparian States
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- China: The Three Gorges Dam Hydroelectric Project
- Creative Options and Value Creation to Address Water Security in the Eastern Nile Basin
G
I
M
R
T
- The Caspian- a Sea or a Lake?
- The Pecos River Compact and Texas - New Mexico Dispute
- The Republican River Compact
U
U cont.
W