Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Land Use :
forest land or
religious/cultural sites
& Water Use :
Hydropower Generation or
Industry - non-consumptive use or
Other
& Stakeholder Type :
Development/humanitarian interest or
Environmental interest or
Industry/Corporate Interest
& Key Question :
How can increasing urban water demand be balanced between the needs of the urban population and industry? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions? or
Other
Click on one or more items below to narrow your results.
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
E
- Efforts of Coordinating Joint Development of Hydropower Projects Within the Salween Basin
- Efforts to Resolve the Aral Sea Crisis
F
I
I cont.
- Integrated Management and Negotiations for Equitable Allocation of Flow of the Jordan River Among Riparian States
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
M
N
P
R
T
U