Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Stakeholder Type :
Environmental interest or
Non-legislative governmental agency
& Key Question :
How can increasing urban water demand be balanced between the needs of the urban population and industry? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions? or
Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (3)
- Continental (Köppen D-type) (4)
- Dry-summer (3)
- Dry-winter (2)
- Humid mid-latitude (Köppen C-type) (1)
- Moist (2)
- Moist tropical (Köppen A-type) (2)
- Monsoon (2)
- Semi-arid/steppe (Köppen B-type) (2)
- alpine (1)
- cold-climate (permafrost, tundra, polar) (2)
- temperate (1)
- Agriculture or Irrigation (9)
- Domestic/Urban Supply (7)
- Fisheries - farmed (3)
- Fisheries - wild (5)
- Hydropower Generation (8)
- Industry - consumptive use (2)
- Industry - non-consumptive use (3)
- Livestock (1)
- Mining/Extraction support (1)
- Other Ecological Services (6)
- Recreation or Tourism (2)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
F
I
M
- Management of Fisheries in the High Seas of the Central Arctic Ocean
- Mineral and Petroleum Resource Extraction in the Arctic Ocean – Conflicting Oversight, Governance and Rights
N
O
T
- The Lesotho Highlands Water Project
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
U
W