Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Natural, Societal & Political Domain Variables :
Assets or
Other
& Water Use :
Hydropower Generation or
Industry - consumptive use or
Recreation or Tourism
& Stakeholder Type :
Development/humanitarian interest or
Environmental interest
& Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
What calculations and considerations should be investigated by countries looking to harness additional hydropower? Which potential outcomes should be investigated or identified? or
What roles can desalination play in a country's national water policy and what energy ecological and water quality considerations ought to go into making such a decision? or
Other or
Other
Click on one or more items below to narrow your results.
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
- Addressing Declining Groundwater Supply in Umatilla County, Oregon, USA
- Addressing the Transboundary Water Conflict Between the Blue Nile Riparian States
C
- China: The Three Gorges Dam Hydroelectric Project
- Creative Options and Value Creation to Address Water Security in the Eastern Nile Basin
D
E
I
I cont.
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
- International Management for Water Quality Within The Kura-Araks Basin
M
N
R
T
T cont.
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
- Transboundary Dispute Resolution: U.S./Mexico Shared Aquifers
U
- U.S.-Canada Transboundary Water Management
- US-Canada Columbia River Management
- Urmia Lake: The Need for Water Diplomacy
W