Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Stakeholder Type:
Industry/Corporate Interest
& Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
How can packages or options that link issues creatively or build on possible technology innovations be employed to create non-zero sum choices within negotiations that include water resources? or
What mechanisms beyond simple allocation can be incorporated into transboundary water agreements to add value and facilitate resolution? or
What role can agricultural subsidies play in finding solutions to complex water management problems?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (5)
- Continental (Köppen D-type) (3)
- Dry-summer (4)
- Dry-winter (1)
- Humid mid-latitude (Köppen C-type) (3)
- Moist (3)
- Moist tropical (Köppen A-type) (3)
- Monsoon (3)
- Semi-arid/steppe (Köppen B-type) (3)
- alpine (3)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (3)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
- Competing Demands Among Water Uses in the Apalachicola- Chattahoochee-Flint River Basin
- Creative Options and Value Creation to Address Water Security in the Eastern Nile Basin
E
I
I cont.
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
- International Management for Water Quality Within The Kura-Araks Basin
L
M
R
T
- The Lesotho Highlands Water Project
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
U