Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Stakeholder Type:
Industry/Corporate Interest
& Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
How can packages or options that link issues creatively or build on possible technology innovations be employed to create non-zero sum choices within negotiations that include water resources? or
What calculations and considerations should be investigated by countries looking to harness additional hydropower? Which potential outcomes should be investigated or identified? or
What mechanisms beyond simple allocation can be incorporated into transboundary water agreements to add value and facilitate resolution?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (5)
- Continental (Köppen D-type) (3)
- Dry-summer (3)
- Dry-winter (1)
- Humid mid-latitude (Köppen C-type) (3)
- Moist (3)
- Moist tropical (Köppen A-type) (3)
- Monsoon (3)
- Semi-arid/steppe (Köppen B-type) (3)
- alpine (3)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (2)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
E
I
I cont.
- International Joint Development of The La Plata River Basin
- International Management for Water Quality Within The Kura-Araks Basin
L
M
R
T
- The Lesotho Highlands Water Project
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
U