Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
How can mutual trust amongst riparians be nurtured? What actions erode that trust? or
How can packages or options that link issues creatively or build on possible technology innovations be employed to create non-zero sum choices within negotiations that include water resources? or
To what extent can international actors and movements from civil society influence water management? How and when is this beneficial/detrimental and how can these effects be supported/mitigated? or
What effective mechanisms can downstream states/countries use to protect their water related interests/rights?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (4)
- Continental (Köppen D-type) (7)
- Dry-summer (3)
- Dry-winter (6)
- Humid mid-latitude (Köppen C-type) (6)
- Moist (5)
- Moist tropical (Köppen A-type) (6)
- Monsoon (6)
- Semi-arid/steppe (Köppen B-type) (7)
- alpine (2)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (3)
- Agriculture or Irrigation (18)
- Domestic/Urban Supply (13)
- Fisheries - farmed (2)
- Fisheries - wild (8)
- Hydropower Generation (13)
- Industry - consumptive use (4)
- Industry - non-consumptive use (2)
- Livestock (3)
- Mining/Extraction support (3)
- Other Ecological Services (4)
- Recreation or Tourism (3)
- Community or organized citizens (15)
- Cultural Interest (3)
- Development/humanitarian interest (5)
- Environmental interest (10)
- Federated state/territorial/provincial government (12)
- Industry/Corporate Interest (8)
- Local Government (10)
- Non-legislative governmental agency (13)
- Sovereign state/national/federal government (21)
- Supranational union (3)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
B
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- China: The Three Gorges Dam Hydroelectric Project
- Conflict Management Strategies Among Riparians Within the Indus River Basin
E
G
I
I cont.
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Management for Water Quality Within The Kura-Araks Basin
M
O
P
- Pollution in the Pilcomayo: Mining and Indigenous Communities
- Preserving and Monitoring the Guarani Aquifer for Current and Future Use
R
T
T cont.
- The Helmand River Basin Dispute
- The Republican River Compact
- The Syr Darya River Basin Upstream Downstream Disputes
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
U
W
Y