Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Stakeholder Type :
Cultural Interest or
Other
& Key Question :
How can consultation and cooperation among stakeholders and development partners be better facilitated/managed/fostered? or
How can increasing urban water demand be balanced between the needs of the urban population and industry? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (8)
- Continental (Köppen D-type) (6)
- Dry-summer (7)
- Dry-winter (3)
- Humid mid-latitude (Köppen C-type) (2)
- Moist (2)
- Moist tropical (Köppen A-type) (3)
- Monsoon (1)
- Semi-arid/steppe (Köppen B-type) (5)
- alpine (3)
- cold-climate (permafrost, tundra, polar) (2)
- temperate (3)
- Agriculture or Irrigation (14)
- Domestic/Urban Supply (14)
- Fisheries - farmed (2)
- Fisheries - wild (4)
- Hydropower Generation (6)
- Industry - consumptive use (5)
- Industry - non-consumptive use (6)
- Livestock (2)
- Mining/Extraction support (1)
- Other Ecological Services (10)
- Recreation or Tourism (4)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
F
- Flood Management in Maritsa River Basin
- Forming A Groundwater Sustainability Agency for Salinas Valley
- Forming Groundwater Sustainability Agencies for Sonoma County
I
M
- Management of Fisheries in the High Seas of the Central Arctic Ocean
- Management, Protection, and Control of Lake Titicaca
- Mineral and Petroleum Resource Extraction in the Arctic Ocean – Conflicting Oversight, Governance and Rights
N
O
R
R cont.
T
U
W