Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Natural, Societal & Political Domain Variables :
Assets or
Water Quantity
& Climate :
Arid/desert (Köppen B-type) or
Other
& Water Use:
Agriculture or Irrigation
& Stakeholder Type :
Development/humanitarian interest or
Environmental interest
& Key Question :
Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project? or
Other
Click on one or more items below to narrow your results.
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
2
A
- A Salty Affair: An Analysis of U.S. – Mexico Water Diplomacy in the Colorado River
- Addressing Declining Groundwater Supply in Umatilla County, Oregon, USA
- Addressing the Transboundary Water Conflict Between the Blue Nile Riparian States
C
E
- Efforts of Coordinating Joint Development of Hydropower Projects Within the Salween Basin
- Efforts to Resolve the Aral Sea Crisis
F
F cont.
G
I
- Integrated Joint Management Agreements of Mekong River Basin Riparians
- Integrated Management and Negotiations for Equitable Allocation of Flow of the Jordan River Among Riparian States
- International Joint Development of The La Plata River Basin
R
T
T cont.
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
- Transboundary Dispute Resolution: U.S./Mexico Shared Aquifers
U
W