Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Natural, Societal & Political Domain Variables:
Water Quantity
& Climate :
Arid/desert (Köppen B-type) or
Humid mid-latitude (Köppen C-type) or
Moist tropical (Köppen A-type) or
temperate
& Water Use:
Hydropower Generation
& Stakeholder Type :
Environmental interest or
Non-legislative governmental agency
& Key Question :
How can packages or options that link issues creatively or build on possible technology innovations be employed to create non-zero sum choices within negotiations that include water resources? or
What calculations and considerations should be investigated by countries looking to harness additional hydropower? Which potential outcomes should be investigated or identified? or
Other
Click on one or more items below to narrow your results.
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- Case Study of Transboundary Dispute Resolution: the Tigris-Euphrates Basin
- China: The Three Gorges Dam Hydroelectric Project
- Colorado River Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
- Conflict Management Strategies Among Riparians Within the Indus River Basin
C cont.
D
E
I
- Integrated Management and Negotiations for Equitable Allocation of Flow of the Jordan River Among Riparian States
- International Joint Development of The La Plata River Basin
N
O
P
R
T