Maqarin Dam

From AquaPedia Case Study Database
Jump to: navigation, search
needs references
This page could use the addition of additional references and citations. Consider improving it. Check the discussion page to see comments about the work requested.
sections need more detail
This page contains 1 or more sections that lack detail and need improvement! Please consider adding to it. Check the discussion page to see comments about the work requested.
Wikify this page!
This page required additional internal links to other AquaPedia cases or pages. Consider improving it or other "wikification" tasks Check the disscussion page to see comments about the work requested.
page needs links to WWW
This page lacks links to outside sources and additional info available on the Internet. Consider improving it by adding new links. Check the discussion page to see comments about the work requested.

This project has been described as: Dam;Hydropower


In 1952, Miles Bunger, an American attached to the Technical Cooperation Agency in Amman, first suggested the construction of a dam at Maqarin to help even the flow of the Yarmuk River and to tap its hydroelectric potential. The following year, Jordan and UNRWA signed an agreement to implement the Bunger plan the following year, including a dam at Maqarin with a storage capacity of 480 MCM and a diversion dam at Addassiyah, and Syria and Jordan agreed that Syria would receive 2/3 of the hydropower generated, in exchange for Jordan's receiving 7/8 of the natural flow of the river.[1]

  1. ^ Product of the Transboundary Freshwater Dispute Database, Department of Geosciences, Oregon State University. Additional information about the TFDD can be found at:http://www.transboundarywaters.orst.edu/research/case_studies/Jordan_New.htm