Southeast Anatolia Development Project

From AquaPedia Case Study Database
Jump to: navigation, search

This project has been described as: Dam;Hydropower


The Southeast Anatolia Development Project (GAP is the Turkish acronym) has given a sense of urgency to resolving allocation issues on the Euphrates. GAP is a massive undertaking for energy and agricultural development that, when completed, will include the construction of 21 dams and 19 hydroelectric plants on both the Tigris and the Euphrates. 1.65 million ha of land are to be irrigated and 26 billion kWh will be generated annually with an installed capacity of 7,500 MW. If completed as planned, GAP could significantly reduce downstream water quantity and quality.[1]

  1. ^ Product of the Transboundary Freshwater Dispute Database, Department of Geosciences, Oregon State University. Additional information about the TFDD can be found at:http://www.transboundarywaters.orst.edu/research/case_studies/Tigris-Euphrates_New.htm