Issues/Stakeholders/Analysis
From Talk:Water Quality Control of the South-to-North Water Diversion (SNWD) Middle Route Project (MRP)
← Thread:Talk:Water Quality Control of the South-to-North Water Diversion (SNWD) Middle Route Project (MRP)/Issues/Stakeholders/Analysis
← Thread:Talk:Water Quality Control of the South-to-North Water Diversion (SNWD) Middle Route Project (MRP)/Issues/Stakeholders/Analysis
The issues discussed in the Issues section does not track 1-to-1 with the issues discussed in analysis. While I believe a strong case is made, I think the case would benefit from a greater sense of internal consistency.