Difference between revisions of "Treaty on cooperation for the utilization of the natural resources and the development of the Mirim Lagoon basin (Treaty of the Mirim Lagoon basin) and Protocol (Jaguaro River Protocol)"
[checked revision] | [checked revision] |
m (Amanda moved page Treaty on cooperation for the utilization of the natural resources and the development of the Mirim Lagoon basin (Treaty of the Mirim Lagoon basin) and Protocol (Jaguar‹o River Protocol) to [[Treaty on cooperation for the utiliz...) |
|||
Line 2: | Line 2: | ||
|Agreement Signed= 1977/07/07 | |Agreement Signed= 1977/07/07 | ||
|Agreement Type=treaty,trans-national | |Agreement Type=treaty,trans-national | ||
− | |Included Resource={{Link Water Feature |Water Feature=Mirim Lagoon Basin }}{{Link Water Feature |Water Feature= | + | |Included Resource={{Link Water Feature |Water Feature=Mirim Lagoon Basin }}{{Link Water Feature |Water Feature=Jaguaro River}} |
|Included Riparian={{Link Riparian |Riparian=Brazil}}{{Link Riparian |Riparian=Uruguay}} | |Included Riparian={{Link Riparian |Riparian=Brazil}}{{Link Riparian |Riparian=Uruguay}} | ||
|Water Projects Included in Agreement= | |Water Projects Included in Agreement= |
Latest revision as of 10:55, 17 September 2014
Signed: 1977/07/07
Agreement Type: treaty, trans-national
This document replaces the earlier Exchange of notes constituting an agreement between Brazil and Uruguay establishing a joint commission for the development of the Mirim Lagoon.[1] The primary issue covered by this document is economic development.[1]
Comments on this agreement from the TFDD International Freshwater Treaties Database include:The Commision, negotiations established mechanisms in existing treaties.[1]
Case Studies Related to this Agreement
Articles linked to this Agreement
Riparians | Water Features |
---|---|
Agreement includes riparian- Brazil, Uruguay
|
Includes Water Resource- Mirim Lagoon Basin, Jaguaro River
|
Projects and Initiatives | Agreements and Treaties |
---|---|
|
Previous agreement was- Exchange of notes constituting an agreement between Brazil and Uruguay establishing a joint commission for the development of the Mirim Lagoon
|
External Links
- Full EnglishText available from the Transboundary Freshwater Dispute Database (TFDD). Oregon State University. — This agreement is included in the TFDD Agreeements Database.http://ocid.nacse.org/tfdd/treaties.php?page=full&origin=river&tn=390
- ^ 1.0 1.1 1.2 Treaty on cooperation for the utilization of the natural resources and the development of the Mirim Lagoon basin (Treaty of the Mirim Lagoon basin) and Protocol (Jaguar‹o River Protocol) entry in the Transboundary Freshwater Agreements Database, a Product of the Transboundary Freshwater Dispute Database. Department of Geosciences, Oregon State University. Additional information about the TFDD can be found at: <http://www.transboundarywaters.orst.edu>. Entry accessed online August 30 2014 at: http://ocid.nacse.org/tfdd/treaties.php?page=full&origin=river&tn=390