Difference between revisions of "Form:Water Project"
From AquaPedia Case Study Database
Line 75: | Line 75: | ||
</div> | </div> | ||
{{{for template|Link Water Feature|multiple|embed in field=Water Project[Organization Covers Water Feature]|add button text=Click to Add Another|label=Water Features covered by this organization }}} | {{{for template|Link Water Feature|multiple|embed in field=Water Project[Organization Covers Water Feature]|add button text=Click to Add Another|label=Water Features covered by this organization }}} | ||
− | {{{field|Feature|property=Water Feature|input type=combobox|autocomplete on category=Water Feature|remote autocompletion}}} | + | {{{field|Feature|property=Water Feature|input type=combobox|delimiter=;|autocomplete on category=Water Feature|remote autocompletion}}} |
{{{end template}}} | {{{end template}}} | ||
Revision as of 08:17, 4 August 2014
This is the "Water Project" form. It is used to create pages for built infrastructure water projects such as a dam or reservoir and also for organizational initiatives such as a joint commission or advisory group.
To create a page with this form, enter the page name below; if a page with that name already exists, you will be sent to a form to edit that page. each page must have a unique name, so please select a name for your project that is not ambiguous (e.g. Joint River Commission is ambiguous, as there are several)
Example Names:
- Glen Canyon Dam
- Joint River Comission, Mekong River