Difference between revisions of "Form:Water Project"

From AquaPedia Case Study Database
Jump to: navigation, search
Line 33: Line 33:
 
(such as for a dam)
 
(such as for a dam)
  
'''Maximum Hydropower Production Rating:'''  {{{field|Maximum Power Rating| property=Maximum Power Rating|size=8}}} MW<BR/>
+
Hydropower Capacity Rating:'''  {{{field|Capacity Rating| property=Capacity Rating|size=8}}} MW<BR/>
 
(such as for a hydropower project)
 
(such as for a hydropower project)
  

Revision as of 14:03, 28 January 2013

This is the "Water Project" form. It is used to create pages for built infrastructure water projects such as a dam or reservoir and also for organizational initiatives such as a joint commission or advisory group.

To create a page with this form, enter the page name below; if a page with that name already exists, you will be sent to a form to edit that page. each page must have a unique name, so please select a name for your project that is not ambiguous (e.g. Joint River Commission is ambiguous, as there are several)

Example Names:

  • Glen Canyon Dam
  • Joint River Comission, Mekong River