Difference between revisions of "Maqarin Dam"
From AquaPedia Case Study Database
[checked revision] | [checked revision] |
Mpritchard (Talk | contribs) |
Mpritchard (Talk | contribs) |
||
Line 1: | Line 1: | ||
{{Water Project | {{Water Project | ||
− | |Project Type= | + | |Project Type=Dam, Hydropower |
− | |Description= | + | |Description=In 1952, Miles Bunger, an American attached to the Technical Cooperation Agency in Amman, first suggested the construction of a dam at Maqarin to help even the flow of the Yarmuk River and to tap its hydroelectric potential. The following year, Jordan and UNRWA signed an agreement to implement the Bunger plan the following year, including a dam at Maqarin with a storage capacity of 480 MCM and a diversion dam at Addassiyah, and Syria and Jordan agreed that Syria would receive 2/3 of the hydropower generated, in exchange for Jordan's receiving 7/8 of the natural flow of the river.<ref name = "TFDD 2012">Product of the [http://www.transboundarywaters.orst.edu/database/DatabaseIntro.html Transboundary Freshwater Dispute Database], Department of Geosciences, Oregon State University. Additional information about the TFDD can be found at:http://www.transboundarywaters.orst.edu/research/case_studies/Jordan_New.htm </ref> |
|External Links= | |External Links= | ||
− | |Case Review= | + | |Case Review={{Case Review Boxes |
+ | |Empty Section=No | ||
+ | |Clean Up Required=No | ||
+ | |Expand Section=No | ||
+ | |Add References=No | ||
+ | |Wikify=No | ||
+ | |connect to www=No | ||
+ | |Disputed=No | ||
+ | |Mpov=No | ||
}} | }} | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
}} | }} |
Revision as of 15:03, 14 August 2012
In 1952, Miles Bunger, an American attached to the Technical Cooperation Agency in Amman, first suggested the construction of a dam at Maqarin to help even the flow of the Yarmuk River and to tap its hydroelectric potential. The following year, Jordan and UNRWA signed an agreement to implement the Bunger plan the following year, including a dam at Maqarin with a storage capacity of 480 MCM and a diversion dam at Addassiyah, and Syria and Jordan agreed that Syria would receive 2/3 of the hydropower generated, in exchange for Jordan's receiving 7/8 of the natural flow of the river.[1]
- ^ Product of the Transboundary Freshwater Dispute Database, Department of Geosciences, Oregon State University. Additional information about the TFDD can be found at:http://www.transboundarywaters.orst.edu/research/case_studies/Jordan_New.htm