Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Stakeholder Type:
Industry/Corporate Interest
& Key Question :
How can packages or options that link issues creatively or build on possible technology innovations be employed to create non-zero sum choices within negotiations that include water resources? or
How do issues of equity and development impact the identification of stakeholders in cases involving hydropower or other revenue generating water infrastructure? or
How do national policies influence water use at the local level? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (3)
- Continental (Köppen D-type) (3)
- Dry-summer (3)
- Humid mid-latitude (Köppen C-type) (3)
- Moist (2)
- Moist tropical (Köppen A-type) (3)
- Monsoon (3)
- Semi-arid/steppe (Köppen B-type) (1)
- alpine (2)
- cold-climate (permafrost, tundra, polar) (2)
- temperate (1)
- Agriculture or Irrigation (9)
- Domestic/Urban Supply (9)
- Fisheries - farmed (4)
- Fisheries - wild (7)
- Hydropower Generation (8)
- Industry - consumptive use (3)
- Industry - non-consumptive use (4)
- Livestock (2)
- Mining/Extraction support (1)
- Other Ecological Services (7)
- Recreation or Tourism (4)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
C
- Case Study of Transboundary Dispute Resolution: the Tigris-Euphrates Basin
- Competing Demands Among Water Uses in the Apalachicola- Chattahoochee-Flint River Basin
D
E
F
I
M
- Management of Fisheries in the High Seas of the Central Arctic Ocean
- Mineral and Petroleum Resource Extraction in the Arctic Ocean – Conflicting Oversight, Governance and Rights
N
R
T
U
W