Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Water Use:
Hydropower Generation
& Stakeholder Type :
Development/humanitarian interest or
Environmental interest
& Key Question :
How can increasing urban water demand be balanced between the needs of the urban population and industry? or
Other
Click on one or more items below to narrow your results.
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
- China: The Three Gorges Dam Hydroelectric Project
- Creative Options and Value Creation to Address Water Security in the Eastern Nile Basin
D
E
I
- Integrated Joint Management Agreements of Mekong River Basin Riparians
- Integrated Management and Negotiations for Equitable Allocation of Flow of the Jordan River Among Riparian States
- International Joint Development of The La Plata River Basin
R
T
T cont.
U
W