Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Water Use:
Hydropower Generation
& Stakeholder Type:
Environmental interest
& Key Question :
How can increasing urban water demand be balanced between the needs of the urban population and industry? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions? or
Other
Click on one or more items below to narrow your results.
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
- China: The Three Gorges Dam Hydroelectric Project
- Creative Options and Value Creation to Address Water Security in the Eastern Nile Basin
D
E
I
- Integrated Joint Management Agreements of Mekong River Basin Riparians
- International Joint Development of The La Plata River Basin
R
T
U
W