Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Stakeholder Type :
Development/humanitarian interest or
Industry/Corporate Interest
& Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
How do issues of equity and development impact the identification of stakeholders in cases involving hydropower or other revenue generating water infrastructure? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions? or
What mechanisms beyond simple allocation can be incorporated into transboundary water agreements to add value and facilitate resolution?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (8)
- Continental (Köppen D-type) (7)
- Dry-summer (5)
- Dry-winter (3)
- Humid mid-latitude (Köppen C-type) (5)
- Moist (3)
- Moist tropical (Köppen A-type) (5)
- Monsoon (4)
- Semi-arid/steppe (Köppen B-type) (5)
- alpine (3)
- cold-climate (permafrost, tundra, polar) (2)
- temperate (2)
- Agriculture or Irrigation (17)
- Domestic/Urban Supply (17)
- Fisheries - farmed (4)
- Fisheries - wild (6)
- Hydropower Generation (12)
- Industry - consumptive use (6)
- Industry - non-consumptive use (5)
- Livestock (3)
- Mining/Extraction support (2)
- Other Ecological Services (12)
- Recreation or Tourism (4)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
- Case Study of Transboundary Dispute Resolution: the Tigris-Euphrates Basin
- Creative Options and Value Creation to Address Water Security in the Eastern Nile Basin
D
E
F
I
I cont.
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
- International Management for Water Quality Within The Kura-Araks Basin
L
M
- Management of Fisheries in the High Seas of the Central Arctic Ocean
- Management, Protection, and Control of Lake Titicaca
- Mineral and Petroleum Resource Extraction in the Arctic Ocean – Conflicting Oversight, Governance and Rights
N
R
T
- The Lesotho Highlands Water Project
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
U
W