Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Land Use :
agricultural- cropland and pasture or
mining operations
& Stakeholder Type :
Development/humanitarian interest or
Local Government or
Non-legislative governmental agency
& Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
How do issues of equity and development impact the identification of stakeholders in cases involving hydropower or other revenue generating water infrastructure? or
To what extent can international actors and movements from civil society influence water management? How and when is this beneficial/detrimental and how can these effects be supported/mitigated? or
What effective mechanisms can downstream states/countries use to protect their water related interests/rights? or
Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (3)
- Continental (Köppen D-type) (5)
- Dry-summer (4)
- Dry-winter (3)
- Humid mid-latitude (Köppen C-type) (4)
- Moist (4)
- Moist tropical (Köppen A-type) (4)
- Monsoon (4)
- Semi-arid/steppe (Köppen B-type) (5)
- alpine (2)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (2)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- China: The Three Gorges Dam Hydroelectric Project
- Conflict Management Strategies Among Riparians Within the Indus River Basin
I
I cont.
M
O
P
R
U
- U.S.-Canada Transboundary Water Management
- Upstream Hydropower Development in the Syr Darya River Basin, Downstream Impacts, and Potential Opportunities
- Urmia Lake: The Need for Water Diplomacy
Y