Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Stakeholder Type:
Environmental interest
& Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
How can increasing urban water demand be balanced between the needs of the urban population and industry? or
What mechanisms beyond simple allocation can be incorporated into transboundary water agreements to add value and facilitate resolution? or
Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (6)
- Continental (Köppen D-type) (5)
- Dry-summer (4)
- Dry-winter (3)
- Humid mid-latitude (Köppen C-type) (5)
- Moist (3)
- Moist tropical (Köppen A-type) (4)
- Monsoon (3)
- Semi-arid/steppe (Köppen B-type) (7)
- alpine (2)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (1)
- Agriculture or Irrigation (14)
- Domestic/Urban Supply (12)
- Fisheries - farmed (3)
- Fisheries - wild (5)
- Hydropower Generation (7)
- Industry - consumptive use (4)
- Industry - non-consumptive use (1)
- Livestock (3)
- Mining/Extraction support (1)
- Other Ecological Services (7)
- Recreation or Tourism (2)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
E
- Efforts of Coordinating Joint Development of Hydropower Projects Within the Salween Basin
- Efforts to Resolve the Aral Sea Crisis
I
I cont.
- International Joint Development of The La Plata River Basin
- International Management for Water Quality Within The Kura-Araks Basin
L
M
- Management of Fisheries in the High Seas of the Central Arctic Ocean
- Management, Protection, and Control of Lake Titicaca
T
T cont.
U