Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Water Use:
Hydropower Generation
& Stakeholder Type:
Non-legislative governmental agency
& Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
How can increasing urban water demand be balanced between the needs of the urban population and industry? or
How can packages or options that link issues creatively or build on possible technology innovations be employed to create non-zero sum choices within negotiations that include water resources? or
What mechanisms beyond simple allocation can be incorporated into transboundary water agreements to add value and facilitate resolution?
Click on one or more items below to narrow your results.
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- Colorado River Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
- Conflict Management Strategies Among Riparians Within the Indus River Basin
I
I cont.
- Integrated Management and Negotiations for Equitable Allocation of Flow of the Jordan River Among Riparian States
- International Joint Development of The La Plata River Basin
N
P
T
- The Lesotho Highlands Water Project
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
U