Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Land Use:
industrial use
& Water Use :
Hydropower Generation or
Industry - consumptive use or
Industry - non-consumptive use or
Other Ecological Services or
Recreation or Tourism
& Stakeholder Type :
Environmental interest or
Industry/Corporate Interest or
Other
& Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
How does asymmetry of power influence water negotiations and how can the negative effects be mitigated? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions?
Click on one or more items below to narrow your results.
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
C
- Case Study of Transboundary Dispute Resolution: the Tigris-Euphrates Basin
- Conflict Management Strategies Among Riparians Within the Indus River Basin
F
I
I cont.
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
T
W