Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Stakeholder Type:
Non-legislative governmental agency
& Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
How does asymmetry of power influence water negotiations and how can the negative effects be mitigated? or
What calculations and considerations should be investigated by countries looking to harness additional hydropower? Which potential outcomes should be investigated or identified? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (6)
- Continental (Köppen D-type) (5)
- Dry-summer (3)
- Dry-winter (2)
- Humid mid-latitude (Köppen C-type) (4)
- Moist (3)
- Moist tropical (Köppen A-type) (3)
- Monsoon (2)
- Semi-arid/steppe (Köppen B-type) (4)
- alpine (1)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (2)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
- Case Study of Transboundary Dispute Resolution: the Tigris-Euphrates Basin
- Conflict Management Strategies Among Riparians Within the Indus River Basin
F
I
I cont.
- Integrated Management and Negotiations for Equitable Allocation of Flow of the Jordan River Among Riparian States
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
M
N
T
- The Lesotho Highlands Water Project
- The Role of the Red Sea-Dead Sea Water Conveyance Project for Regional Cooperation in the Jordan River Basin
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
W