Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Water Use :
Hydropower Generation or
Mining/Extraction support
& Stakeholder Type:
Community or organized citizens
& Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
How can packages or options that link issues creatively or build on possible technology innovations be employed to create non-zero sum choices within negotiations that include water resources? or
Other
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (3)
- Continental (Köppen D-type) (5)
- Dry-summer (3)
- Dry-winter (2)
- Humid mid-latitude (Köppen C-type) (5)
- Moist (5)
- Moist tropical (Köppen A-type) (6)
- Monsoon (5)
- Semi-arid/steppe (Köppen B-type) (5)
- alpine (3)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- Case Study of Transboundary Dispute Resolution: the Tigris-Euphrates Basin
- China: The Three Gorges Dam Hydroelectric Project
D
E
F
I
I cont.
L
M
N
O
P
R
T
U
W
Y