Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Stakeholder Type :
Cultural Interest or
Industry/Corporate Interest
& Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
How can packages or options that link issues creatively or build on possible technology innovations be employed to create non-zero sum choices within negotiations that include water resources? or
To what extent can international actors and movements from civil society influence water management? How and when is this beneficial/detrimental and how can these effects be supported/mitigated?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (3)
- Continental (Köppen D-type) (3)
- Dry-summer (2)
- Dry-winter (2)
- Humid mid-latitude (Köppen C-type) (4)
- Moist (2)
- Moist tropical (Köppen A-type) (2)
- Monsoon (2)
- Semi-arid/steppe (Köppen B-type) (3)
- alpine (2)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (2)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- China: The Three Gorges Dam Hydroelectric Project
E
I
I cont.
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Management for Water Quality Within The Kura-Araks Basin
M
P
T
W