Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Natural, Societal & Political Domain Variables:
Assets
& Stakeholder Type:
Federated state/territorial/provincial government
& Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
How can government be dis/incentivized to offer an inclusive planning process? or
Other
Click on one or more items below to narrow your results.
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
2
A
C
- China: The Three Gorges Dam Hydroelectric Project
- Colorado River Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
- Competing Demands Among Water Uses in the Apalachicola- Chattahoochee-Flint River Basin
G
M
T
- The Caspian- a Sea or a Lake?
- The Helmand River Basin Dispute
- The Pecos River Compact and Texas - New Mexico Dispute
- The Role of the Red Sea-Dead Sea Water Conveyance Project for Regional Cooperation in the Jordan River Basin
U
U cont.
W
- Water Management, Environment and Self-determination in Catalonia, Spain
- Water Quality Control of the South-to-North Water Diversion (SNWD) Middle Route Project (MRP)
Y