Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
How can government be dis/incentivized to offer an inclusive planning process? or
How can packages or options that link issues creatively or build on possible technology innovations be employed to create non-zero sum choices within negotiations that include water resources? or
To what extent can international actors and movements from civil society influence water management? How and when is this beneficial/detrimental and how can these effects be supported/mitigated? or
What effective mechanisms can downstream states/countries use to protect their water related interests/rights?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (5)
- Continental (Köppen D-type) (7)
- Dry-summer (5)
- Dry-winter (6)
- Humid mid-latitude (Köppen C-type) (7)
- Moist (5)
- Moist tropical (Köppen A-type) (5)
- Monsoon (5)
- Semi-arid/steppe (Köppen B-type) (7)
- alpine (2)
- cold-climate (permafrost, tundra, polar) (2)
- temperate (3)
- Agriculture or Irrigation (17)
- Domestic/Urban Supply (13)
- Fisheries - farmed (3)
- Fisheries - wild (6)
- Hydropower Generation (12)
- Industry - consumptive use (6)
- Industry - non-consumptive use (2)
- Livestock (4)
- Mining/Extraction support (3)
- Other Ecological Services (5)
- Recreation or Tourism (1)
- Community or organized citizens (14)
- Cultural Interest (5)
- Development/humanitarian interest (7)
- Environmental interest (12)
- Federated state/territorial/provincial government (11)
- Industry/Corporate Interest (11)
- Local Government (9)
- Non-legislative governmental agency (11)
- Sovereign state/national/federal government (21)
- Supranational union (3)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
B
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- China: The Three Gorges Dam Hydroelectric Project
- Conflict Management Strategies Among Riparians Within the Indus River Basin
E
I
I cont.
L
M
- Management of Fisheries in the High Seas of the Central Arctic Ocean
- Mineral and Petroleum Resource Extraction in the Arctic Ocean – Conflicting Oversight, Governance and Rights
O
P
- Pollution in the Pilcomayo: Mining and Indigenous Communities
- Preserving and Monitoring the Guarani Aquifer for Current and Future Use
R
T
- The Caspian- a Sea or a Lake?
- The Syr Darya River Basin Upstream Downstream Disputes
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
U
- Upstream Hydropower Development in the Syr Darya River Basin, Downstream Impacts, and Potential Opportunities
- Urmia Lake: The Need for Water Diplomacy
W