Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Climate :
Dry-winter or
Moist or
temperate
& Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
How can increasing urban water demand be balanced between the needs of the urban population and industry? or
Other
Click on one or more items below to narrow your results.
- Community or organized citizens (12)
- Cultural Interest (3)
- Development/humanitarian interest (5)
- Environmental interest (10)
- Federated state/territorial/provincial government (6)
- Industry/Corporate Interest (10)
- Local Government (7)
- Non-legislative governmental agency (14)
- Sovereign state/national/federal government (19)
- Supranational union (3)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
B
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- Competing Demands Among Water Uses in the Apalachicola- Chattahoochee-Flint River Basin
- Conflict Management Strategies Among Riparians Within the Indus River Basin
E
I
I cont.
- Integrated Management and Negotiations for Equitable Allocation of Flow of the Jordan River Among Riparian States
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
- International Management for Water Quality Within The Kura-Araks Basin
M
N
O
P
R
T
- The Lesotho Highlands Water Project
- The Syr Darya River Basin Upstream Downstream Disputes
- Transboundary Dispute Resolution: U.S./Mexico Shared Aquifers
W