Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project?

From AquaPedia Case Study Database
Jump to: navigation, search

Key Question Categor(ies):Urban Water Systems and Water Treatment

Case Studies that Answer this Question

From: Impacts of the Grand Ethiopian Renaissance Dam on Downstream Countries[edit]



From: Integrated Joint Management Agreements of Mekong River Basin Riparians[edit]



From: Organization for the Development of the Senegal River[edit]

Mutually beneficial projects and integrated investments create good neighbors. As a result of the OMVS and the design and implementation of joint projects, the relations between the countries has improved and economic development has increased thereby making cooperation rather than conflict a meeting point with regards to the Senegal River.

From: The Lesotho Highlands Water Project[edit]

It is more economically sound to begin impact studies before nations start to construct projects. It was shown through the Lesotho Highlands Water Project that if impact studies are started after the initiation of a major hydro-project, the costs for the project go up as necessary components for the project may not have been considered pre-study. For the Phase II of the LHWP, studies are being conducted to judge the feasibility of a project that was designed more than 15 years to ago to investigate in a more comprehensive manner the possible impacts of the project.

From: US-Canada Columbia River Management[edit]



From: Yarlung Zangbo / Brahmaputra River: Competing Priorities of Hydropower and Agriculture[edit]

While the benefits of electricity generation can create a positive impact at the regional or national level, the disadvantages of hydropower generation (such as reduced river flow) can impact those populations living closest or downstream of a hydropower project.