Difference between revisions of "Maqarin Dam"

From AquaPedia Case Study Database
Jump to: navigation, search
[checked revision][checked revision]
(review)
 
Line 6: Line 6:
 
|Empty Section=No
 
|Empty Section=No
 
|Clean Up Required=No
 
|Clean Up Required=No
|Expand Section=No
+
|Expand Section=Yes
|Add References=No
+
|Add References=Yes
|Wikify=No
+
|Wikify=Yes
|connect to www=No
+
|connect to www=Yes
 
|Disputed=No
 
|Disputed=No
 
|Mpov=No
 
|Mpov=No
 
}}
 
}}
 
}}
 
}}

Latest revision as of 15:45, 6 September 2012


needs references
sections need more detail
Wikify this page!
page needs links to WWW

Described as:
- Dam
- Hydropower




view/browse all article properties


In 1952, Miles Bunger, an American attached to the Technical Cooperation Agency in Amman, first suggested the construction of a dam at Maqarin to help even the flow of the Yarmuk River and to tap its hydroelectric potential. The following year, Jordan and UNRWA signed an agreement to implement the Bunger plan the following year, including a dam at Maqarin with a storage capacity of 480 MCM and a diversion dam at Addassiyah, and Syria and Jordan agreed that Syria would receive 2/3 of the hydropower generated, in exchange for Jordan's receiving 7/8 of the natural flow of the river.[1]

  1. ^ Product of the Transboundary Freshwater Dispute Database, Department of Geosciences, Oregon State University. Additional information about the TFDD can be found at:http://www.transboundarywaters.orst.edu/research/case_studies/Jordan_New.htm



Case Studies Related to Maqarin Dam


Articles linked to Maqarin Dam

Riparians Water Features







Projects and Initiatives Agreements and Treaties