Difference between revisions of "Itaipu Dam"

From AquaPedia Case Study Database
Jump to: navigation, search
[unchecked revision][unchecked revision]
Line 3: Line 3:
 
|Description=Construction of the Itaipu Dam began in 1973 and completed in 1991.  Community conflicts arose during the construction of the project due to little or no compensation to those who were displaced. However, after involvement from joint planning between the Brazilian and Paraguayan governments the major ecological and social impacts were mitigated.<ref name= "Hydropolitical Vulnerability and Resilience along International Waters">Newton, Joshua T. (2007). Hydropolitical Vulnerability and Resilience along International Waters. United Nations Environment Programme. Chapter 3. pg 55. </ref>
 
|Description=Construction of the Itaipu Dam began in 1973 and completed in 1991.  Community conflicts arose during the construction of the project due to little or no compensation to those who were displaced. However, after involvement from joint planning between the Brazilian and Paraguayan governments the major ecological and social impacts were mitigated.<ref name= "Hydropolitical Vulnerability and Resilience along International Waters">Newton, Joshua T. (2007). Hydropolitical Vulnerability and Resilience along International Waters. United Nations Environment Programme. Chapter 3. pg 55. </ref>
  
|External Links={{External Link
+
|External Links=
|Link Text=Tra
+
}}
+
 
|Case Review={{Case Review Boxes
 
|Case Review={{Case Review Boxes
 
|Empty Section=No
 
|Empty Section=No

Revision as of 10:56, 8 August 2012


Described as:
- "dam" is not in the list of possible values (Dam, Aqueduct/canal/transmission system, Irrigation, Wastewater Treatment, Drinking Water Treatment, Hydropower, Storage, Desalination Project) for this property.
- "hydropower" is not in the list of possible values (Dam, Aqueduct/canal/transmission system, Irrigation, Wastewater Treatment, Drinking Water Treatment, Hydropower, Storage, Desalination Project) for this property.




view/browse all article properties


Construction of the Itaipu Dam began in 1973 and completed in 1991. Community conflicts arose during the construction of the project due to little or no compensation to those who were displaced. However, after involvement from joint planning between the Brazilian and Paraguayan governments the major ecological and social impacts were mitigated.[1]

  1. ^ Newton, Joshua T. (2007). Hydropolitical Vulnerability and Resilience along International Waters. United Nations Environment Programme. Chapter 3. pg 55.



Case Studies Related to Itaipu Dam


Articles linked to Itaipu Dam

Riparians Water Features







Projects and Initiatives Agreements and Treaties