Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Natural, Societal & Political Domain Variables :
Assets or
Water Quality
& Land Use :
agricultural- confined livestock operations or
agricultural- cropland and pasture
& Water Use :
Fisheries - farmed or
Other Ecological Services
& Stakeholder Type:
Sovereign state/national/federal government
& Key Question :
Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project? or
Other
Click on one or more items below to narrow your results.
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
- A Salty Affair: An Analysis of U.S. – Mexico Water Diplomacy in the Colorado River
- Addressing Declining Groundwater Supply in Umatilla County, Oregon, USA
- Addressing the Transboundary Water Conflict Between the Blue Nile Riparian States
C
E
F
I
- Integrated Joint Management Agreements of Mekong River Basin Riparians
- International Joint Development of The La Plata River Basin
M
T
U
W