Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Stakeholder Type :
Federated state/territorial/provincial government or
Local Government
& Key Question :
How does asymmetry of power influence water negotiations and how can the negative effects be mitigated? or
To what extent can international actors and movements from civil society influence water management? How and when is this beneficial/detrimental and how can these effects be supported/mitigated? or
What calculations and considerations should be investigated by countries looking to harness additional hydropower? Which potential outcomes should be investigated or identified?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (4)
- Continental (Köppen D-type) (3)
- Dry-summer (1)
- Dry-winter (2)
- Humid mid-latitude (Köppen C-type) (2)
- Moist (2)
- Moist tropical (Köppen A-type) (2)
- Monsoon (2)
- Semi-arid/steppe (Köppen B-type) (6)
- alpine (1)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- China: The Three Gorges Dam Hydroelectric Project
- Conflict Management Strategies Among Riparians Within the Indus River Basin
I
I cont.
L
M
O
T
T cont.
- The Helmand River Basin Dispute
- The Role of the Red Sea-Dead Sea Water Conveyance Project for Regional Cooperation in the Jordan River Basin
Y