Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Natural, Societal & Political Domain Variables:
Assets
& Water Use :
Hydropower Generation or
Industry - consumptive use
& Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
Other
Click on one or more items below to narrow your results.
- Community or organized citizens (15)
- Cultural Interest (4)
- Development/humanitarian interest (7)
- Environmental interest (14)
- Federated state/territorial/provincial government (10)
- Industry/Corporate Interest (12)
- Local Government (12)
- Non-legislative governmental agency (15)
- Sovereign state/national/federal government (20)
- Supranational union (4)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
- Case Study of Transboundary Dispute Resolution: the Tigris-Euphrates Basin
- China: The Three Gorges Dam Hydroelectric Project
- Colorado River Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
- Conflict Management Strategies Among Riparians Within the Indus River Basin
- Creative Options and Value Creation to Address Water Security in the Eastern Nile Basin
E
F
I
- Integrated Joint Management Agreements of Mekong River Basin Riparians
- International Joint Development of The La Plata River Basin
N
O
P
R
T
T cont.
U
- U.S.-Canada Transboundary Water Management
- US-Canada Columbia River Management
- Urmia Lake: The Need for Water Diplomacy
W
- Water Management, Environment and Self-determination in Catalonia, Spain
- Water Quality Control of the South-to-North Water Diversion (SNWD) Middle Route Project (MRP)
Y