Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Land Use :
industrial use or
rangeland
& Stakeholder Type:
Industry/Corporate Interest
& Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
Other
Click on one or more items below to narrow your results.
- Agriculture or Irrigation (15)
- Domestic/Urban Supply (14)
- Fisheries - farmed (2)
- Fisheries - wild (4)
- Hydropower Generation (9)
- Industry - consumptive use (6)
- Industry - non-consumptive use (4)
- Livestock (3)
- Mining/Extraction support (3)
- Other Ecological Services (5)
- Recreation or Tourism (3)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
D
E
F
I
I cont.
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
- International Management for Water Quality Within The Kura-Araks Basin
L
P
R
R cont.
T
- The Lesotho Highlands Water Project
- The Role of the Red Sea-Dead Sea Water Conveyance Project for Regional Cooperation in the Jordan River Basin
U
W