Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Stakeholder Type:
Industry/Corporate Interest
& Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions? or
What kinds of water treaties or agreements between countries can provide sufficient structure and stability to ensure enforceability but also be flexible and adaptable given future uncertainties? or
What mechanisms beyond simple allocation can be incorporated into transboundary water agreements to add value and facilitate resolution?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (5)
- Continental (Köppen D-type) (6)
- Dry-summer (4)
- Dry-winter (1)
- Humid mid-latitude (Köppen C-type) (4)
- Moist (3)
- Moist tropical (Köppen A-type) (3)
- Monsoon (3)
- Semi-arid/steppe (Köppen B-type) (3)
- alpine (3)
- cold-climate (permafrost, tundra, polar) (2)
- temperate (2)
- Agriculture or Irrigation (13)
- Domestic/Urban Supply (13)
- Fisheries - farmed (4)
- Fisheries - wild (7)
- Hydropower Generation (9)
- Industry - consumptive use (5)
- Industry - non-consumptive use (3)
- Livestock (4)
- Mining/Extraction support (2)
- Other Ecological Services (11)
- Recreation or Tourism (4)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
E
F
I
I cont.
- International Joint Development of The La Plata River Basin
- International Management for Water Quality Within The Kura-Araks Basin
L
M
N
R
T
- The Lesotho Highlands Water Project
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
U
W