Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Water Use :
Hydropower Generation or
Industry - consumptive use
& Stakeholder Type:
Environmental interest
& Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
How does asymmetry of power influence water negotiations and how can the negative effects be mitigated? or
Other
Click on one or more items below to narrow your results.
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
- China: The Three Gorges Dam Hydroelectric Project
- Creative Options and Value Creation to Address Water Security in the Eastern Nile Basin
D
E
I
I cont.
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
- International Management for Water Quality Within The Kura-Araks Basin
R
T
T cont.
U
- U.S.-Canada Transboundary Water Management
- US-Canada Columbia River Management
- Urmia Lake: The Need for Water Diplomacy
W