Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
How can increasing urban water demand be balanced between the needs of the urban population and industry? or
To what extent can international actors and movements from civil society influence water management? How and when is this beneficial/detrimental and how can these effects be supported/mitigated? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions? or
Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (6)
- Continental (Köppen D-type) (10)
- Dry-summer (6)
- Dry-winter (4)
- Humid mid-latitude (Köppen C-type) (6)
- Moist (5)
- Moist tropical (Köppen A-type) (5)
- Monsoon (5)
- Semi-arid/steppe (Köppen B-type) (6)
- alpine (3)
- cold-climate (permafrost, tundra, polar) (2)
- temperate (4)
- Agriculture or Irrigation (19)
- Domestic/Urban Supply (15)
- Fisheries - farmed (4)
- Fisheries - wild (10)
- Hydropower Generation (15)
- Industry - consumptive use (6)
- Industry - non-consumptive use (5)
- Livestock (3)
- Mining/Extraction support (3)
- Other Ecological Services (7)
- Recreation or Tourism (3)
- Community or organized citizens (18)
- Cultural Interest (5)
- Development/humanitarian interest (6)
- Environmental interest (14)
- Federated state/territorial/provincial government (13)
- Industry/Corporate Interest (14)
- Local Government (12)
- Non-legislative governmental agency (15)
- Sovereign state/national/federal government (25)
- Supranational union (5)
Showing below up to 26 results in range #1 to #26.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- China: The Three Gorges Dam Hydroelectric Project
- Conflict Management Strategies Among Riparians Within the Indus River Basin
E
F
I
- Impacts of the Grand Ethiopian Renaissance Dam on Downstream Countries
- Integrated Joint Management Agreements of Mekong River Basin Riparians
- Integrated Management and Negotiations for Equitable Allocation of Flow of the Jordan River Among Riparian States
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
I cont.
L
M
- Management of Fisheries in the High Seas of the Central Arctic Ocean
- Mineral and Petroleum Resource Extraction in the Arctic Ocean – Conflicting Oversight, Governance and Rights
N
O
P
- Pollution in the Pilcomayo: Mining and Indigenous Communities
- Preserving and Monitoring the Guarani Aquifer for Current and Future Use
R
T
- The Caspian- a Sea or a Lake?
- The Lesotho Highlands Water Project
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
U
W
- Water Management, Environment and Self-determination in Catalonia, Spain
- Water Quality and Pollution Control in the Rhine River Basin
Y