Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Land Use :
industrial use or
mining operations
& Water Use :
Hydropower Generation or
Other
& Stakeholder Type :
Community or organized citizens or
Development/humanitarian interest or
Industry/Corporate Interest or
Non-legislative governmental agency
& Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
What calculations and considerations should be investigated by countries looking to harness additional hydropower? Which potential outcomes should be investigated or identified? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions? or
Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (2)
- Continental (Köppen D-type) (4)
- Dry-summer (1)
- Dry-winter (2)
- Humid mid-latitude (Köppen C-type) (2)
- Moist (2)
- Moist tropical (Köppen A-type) (2)
- Monsoon (2)
- Semi-arid/steppe (Köppen B-type) (1)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (1)
Showing below up to 8 results in range #1 to #8.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
E
F
I
I cont.
- Integrated Management and Negotiations for Equitable Allocation of Flow of the Jordan River Among Riparian States
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
M
U
W