Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Land Use :
industrial use or
rangeland
& Water Use :
Domestic/Urban Supply or
Hydropower Generation
& Stakeholder Type :
Development/humanitarian interest or
Environmental interest or
Other
& Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
How does asymmetry of power influence water negotiations and how can the negative effects be mitigated? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions? or
What kinds of water treaties or agreements between countries can provide sufficient structure and stability to ensure enforceability but also be flexible and adaptable given future uncertainties? or
Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project?
Click on one or more items below to narrow your results.
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
B
C
- Case Study of Transboundary Dispute Resolution: the Tigris-Euphrates Basin
- Conflict Management Strategies Among Riparians Within the Indus River Basin
F
I
I cont.
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
L
O
T
T cont.
U
W