Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Land Use :
forest land or
religious/cultural sites or
urban or
Other
& Water Use :
Agriculture or Irrigation or
Fisheries - wild
& Stakeholder Type:
Non-legislative governmental agency
& Key Question :
How can costs for water quality projects be distributed between polluters and beneficiaries? or
How can government be dis/incentivized to offer an inclusive planning process? or
What considerations can be given to incorporating collaborative adaptive management (CAM)? What efforts have the parties made to review and adjust a solution or decision over time in light of changing conditions? or
What mechanisms beyond simple allocation can be incorporated into transboundary water agreements to add value and facilitate resolution? or
Where does the benefit “flow” from a hydropower project and how does that affect implementation and sustainability of the project?
Click on one or more items below to narrow your results.
- Arid/desert (Köppen B-type) (8)
- Continental (Köppen D-type) (8)
- Dry-summer (5)
- Dry-winter (4)
- Humid mid-latitude (Köppen C-type) (3)
- Moist (5)
- Moist tropical (Köppen A-type) (6)
- Monsoon (4)
- Semi-arid/steppe (Köppen B-type) (7)
- alpine (4)
- cold-climate (permafrost, tundra, polar) (1)
- temperate (3)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
- Case Study of Transboundary Dispute Resolution: Multilateral Working Group on Water Resources (Middle East)
- Colorado River Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead
- Conflict Management Strategies Among Riparians Within the Indus River Basin
E
F
I
I cont.
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
- International Management for Water Quality Within The Kura-Araks Basin
M
- Management, Protection, and Control of Lake Titicaca
- Mineral and Petroleum Resource Extraction in the Arctic Ocean – Conflicting Oversight, Governance and Rights
N
O
T
- The Lesotho Highlands Water Project
- The Upper Colorado River Endangered Fish Recovery and San Juan River Basin Recovery Implementation Programs
U
W