Browse by Attribute
Choose a category:
- ASI (43)
- Article (772)
- Case Study (75)
- Key Question (28)
Case Study > Climate :
Moist tropical (Köppen A-type) or
Other or
Other
& Water Use :
Hydropower Generation or
Industry - consumptive use
& Stakeholder Type:
Environmental interest
& Key Question :
How can government be dis/incentivized to offer an inclusive planning process? or
How can increasing urban water demand be balanced between the needs of the urban population and industry? or
What effective mechanisms can downstream states/countries use to protect their water related interests/rights? or
Other
Click on one or more items below to narrow your results.
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
A
C
- China: The Three Gorges Dam Hydroelectric Project
- Creative Options and Value Creation to Address Water Security in the Eastern Nile Basin
D
E
I
I cont.
- Integration of a Basin-Wide Framework for Protecting Danube Water Quality
- International Joint Development of The La Plata River Basin
- International Management for Water Quality Within The Kura-Araks Basin
R
T
U
W